Aurora Flight Sciences of West Virginia

Jarrett Construction Services first met with Aurora when they faced a dire situation – 70% of the design was complete, but the estimated cost of the construction was double the available budget. Once involved, our efforts helped Aurora reduce the estimated cost by $2 million and the design effort recommenced. Under intense deadline pressure from Northrop Grumman, and in conjunction with Aurora and the design team, we began to lay the foundation for very special considerations, notably a ramp with a maximum weight of 28 tons, a level 10,000 rating clean room, and a 1600 square foot glass observation room. Our exclusive Web site services allowed Key stakeholders to stay abreast of the progress. We were also able to save Aurora an additional $452,000, on top of the original $2 million savings.